The wall between Russell's old room and the new construction is gone, defining the entirety of the master bedroom and bath. The new doorway has been framed and the door has been installed. Russell's old window has been moved to its new

location and the new wall that makes Zoe's room 18" wider has been framed. The siding on the south wall is complete.
Russell and Zoe are now living downstairs and the majority of the furniture will be packed and stored by mid-January.
We are still trying to figure out what to do with the shower. The custom pan idea is out of reach financially, but with a bit of downsizing and a preformed pan, we should be able to have pretty much what we want.