The drywall is done.
Much of the remaining work is waiting on the walls and ceilings being painted. Any free time next week will go toward rolling and brushing, brushing and rolling. We have almost all of the primer on and have begun applying the two coats of finish. Once the paint is done, the carpet and vinyl flooring will go in and Myron and Mitch will be back for the finish carpentry (window and door trim and baseboards).
There's a big pile of boxes in the garage that represent plumbing fixtures, light fixtures, vanity cabinets, various doors and other stuff that has faded from memory.
The shower walls are in and the glass doors are in progress.
The maple flooring will be installed Feb 24th and about a week later we vacate the house for about a week so the whole floor can be sanded and finished with three coats of toxic Swedish gloss.
While still out on the horizon, the end is in sight.