Today Mitch installed the last of the siding. He even checked to be sure no birds had nested in the attic space that had been open to the outside for seveal weeks. Except for a couple of trim pieces and paint, the exterior is finished.
After Myron and Mitch put in a plastic wall between the kitchen and living room, the drywall went in really fast. The mud and tape guy, Ted, is about at the halfway point. He is really good, and fast at what he does, though watching him you'd think he was taking his time due to the fluid nature of his movement.
We have picked out carpet and flooring for the master bath. On the 13th, the wood floor people will be bringing in the maple to acclimate. They will install on the 17th and then 3 weeks later we vacate the house for 4 days for the 3 coats of swedish finish that will be put down on the entire floor.
The shower pan was installed last week. The walls will be installed next week and, hopefully, the cabinets for the vanity will be here so the shower people can measure for the vanity top which will match the shower walls.
The skylight in the front bathroom was installed over a week ago. It ended the bathroom cave era and changed the character of the entire landing at the top of the stairs.