It got cold and snow fell last night.
That's okay because most of the plywood sheathing /seismic retrofit work is done. All of the windows are in but for the two back access points.
Plumbing is well under way. Water and outfall are installed and waiting for valves and trim.
The heat ducting is done except for the final hook-up to the furnace.
The electricians got the new conduit from the street to the meter installed and reburied. It still has to be connected by the power company via some confusing two-part process. Recessed lights have been installed in the dining area and the office.
The pocket door frames for the water and walk-in closets are installed.