The majority of the framing and sheathing is complete. The roof sheathing is on, as is the roofing paper. The composite shingles are stacked on the roof and should be installed by the end of the week. The new breaker and meter panels have been installed with conduit and wire running between them. New windows and skylights are in the garage, ready to be installed.
Tuesday, December 2, 2008
The majority of the framing and sheathing is complete. The roof sheathing is on, as is the roofing paper. The composite shingles are stacked on the roof and should be installed by the end of the week. The new breaker and meter panels have been installed with conduit and wire running between them. New windows and skylights are in the garage, ready to be installed.