Saturday, December 6, 2008







The roof is on. All the skylights have been installed, and those in the new construction have been framed. 8 out of the 10 2'x2' windows have been installed. The master bath framing is well under way, with the shower, water closet and walk-in closet taking shape. A trench has been dug from the office to the street to facilitate an upgrade of the conduit and service wire connecting to the new meter and service panels.

Next week the electricians will be here.